MONTHLY UPDATES: Sep 2008
12 Jun 2008
- Amendment 4 RFQ No. AFRPA-08-R-0003-01 Enhanced Use Leasing, Edwards Air Force Base, CA. has been posted under RFQ section below
01 Apr 2008
- Amendment 3 posted under RFQ section below
- FINAL Environmental Baseline Survey is posted under Technical Documents below
28 Mar 2008
- Amendment 2 posted under RFQ section below
- Revised Site Visit Questions and Answers
02 Mar 2008
- Site Visit Q&A posted
- Amendment 1 posted under RFQ section below
- Additional technical documents posted
FAQ
20 Nov 2007 - Frequently Asked Questions (faq) is posted (expect this document to be updated as more content becomes available)
Edwards AFB, CA Renewable Energy EUL Fact Sheet (*.pdf) ~ 22kb
SITE VISIT INFORMATION:
Revision 1 to Edwards AFB Industry Site Visit Questions and Answers, note: revisions are shown in red font
(*.pdf) ~ 38KB
List of Site Visit Attendees (*.pdf) ~ 32KB
Powerpoint Presentation (*.ppt) ~ 27.9 MB (right click link and choose "Save Target As...")
REQUEST FOR QUALIFICATIONS:
Edwards AFB, Edwards Energy RFQ No. AFRPA-08-R-0003-01
Any
unforeseen changes in the scope and
other technical aspects of the project, if required will be modified
and addressed in subsequent Amendments and will be posted to this page. Recommend to check site often for any changes.
1. AMENDMENT 1
RFQ No. AFRPA-08-R-0003-01
Enhanced Use Leasing
Edwards Air Force Base, CA
03 March 2008 (Ledger)
2. AMENDMENT 2
RFQ No. AFRPA-08-R-0003-01
Enhanced Use Leasing
Edwards Air Force Base, CA
28 March 2008
3. AMENDMENT 3
RFQ No. AFRPA-08-R-0003-01
Enhanced Use Leasing
Edwards Air Force Base, CA
01 April 2008
4. AMENDMENT 4
RFQ No. AFRPA-08-R-0003-01
Enhanced Use Leasing
Edwards Air Force Base, CA
12 June 2008
Edwards AFB, Edwards Energy RFQ No. AFRPA-08-R-0003-01
(Amendment 1) - previous versions are obsolete |
|
(*.pdf) ~322KB |
| |
|
|
| Appendix A, Glossary |
|
(*.pdf) ~ 92KB |
| Appendix B, Description and Map of Leased Premises |
|
(*.pdf) ~ 158KB |
| |
Linked pdf items within App B |
|
|
| |
Roads |
|
(*.pdf) ~ |
| |
Site |
|
(*.pdf) ~ |
| |
Solar Plant Vicinity |
|
(*.pdf) ~ |
| |
Topo |
|
(*.pdf) ~ |
| |
Towns |
|
(*.pdf) ~ |
| Appendix C, Non-Exclusive List of Outgrants |
|
(*.pdf) ~ 78KB |
| Appendix D, [RESERVED] |
|
(*.pdf) ~ 78KB |
| Appendix E, [RESERVED] |
|
(*.pdf) ~ 78KB |
| Appendix F, Technical References |
|
(*.pdf) ~ 146KB |
Appendix G, Reporting Requirements Instruction Letter with
Sample Reports |
|
(*.pdf) ~ 79KB |
| Appendix H, Offeror’s Cover Page |
|
(*.pdf) ~ 85KB |
| Appendix I, Non-Disclosure Agreement |
|
(*.pdf) ~ 90KB |
| Appendix J, Past Performance Questionnaire |
|
(*.pdf) ~ 120KB |
| Appendix K, [RESERVED] |
|
(*.pdf) ~ 76KB |
| Appendix L, Mandatory Clauses Required by Federal
Law |
|
(*.pdf) ~ 127KB |
| Appendix M, Insurance Requirements |
|
(*.pdf) ~ 104KB |
| |
|
|
TECHNICAL REFERENCES:
1. Solar Plant Site with contours (*.pdf ~ 7mb)
2. Solar Plant Vicinity (*.pdf ~ 2mb)
3. FINAL Environmental Baseline Survey for Real Esate Enhanced Use Lease to Construct and Maintain a Solar Energy Development, Edwards Air Force Base, California; March 2008. (*.pdf) ~ 7 mb)
4. Attachment 1 EAFB Electrical Load - CY07 (*.pdf) ~ 13KB
5. Attachment 2 EAFB Weather Data (*.pdf) ~ 989KB
/\ Back to top /\